Our facilities
The yard occupies a single site of nearly one million square metres and has approx 1,600 metres of quayside. Three dry docks range in size from 302 by 48 metres to 360 by 60 metres with craneage to match. High capacity steel and painting works underpin its ship repair facilities, supported by comprehensive facilities for machining, engineering and other associated activities. The yard is also known for its expertise in ships’ energy efficiency measures.
Dry Dock
Drydocks | Length, m | Beam, m | Max. draft, m | Lifting capacity, t | Cranes | Cranage, t |
---|---|---|---|---|---|---|
Dry Dock no.1* | 302 | 48 | 9 | — | 2x 120 t, 1x 50 t, 2x 15 t | 2x 480 t |
Dry Dock no.2* | 322 | 48 | 9 | — | 2x 120 t, 1x 50 t, 2x 15 t | 2x 480 t |
Drydock 3 | 360 | 60 | 13 | — | 2x 50 t, 2x 15 t | 1,000 t |
Berth
Berths | Length, m | Beam, m | Max. draft, m | Lifting capacity, t | Cranes | Cranage, t |
---|---|---|---|---|---|---|
Quay A | 620 | — | 7.5 to 9 m | — | 1x 50 t, 1x 16 t | — |
Quay B | 430 | — | 7.5 to 9 m | — | 1x 120 t, 1x 16 t | — |
Quay C | 540 | — | 7.5 to 9 m | — | 2x 50 t | — |
Trial Quay | 130 | — | 7.5 to 9 m | — | — | — |
Dry Dock
Drydocks | Length, ft | Beam, ft | Max. draft, ft | Lifting capacity, lb | Cranes | Cranage, lb |
---|---|---|---|---|---|---|
Dry Dock no.1* | 990.9 | 157.5 | 29.5 | — | 2x 120 t, 1x 50 t, 2x 15 t | 2x 480 t |
Dry Dock no.2* | 1056.5 | 157.5 | 29.5 | — | 2x 120 t, 1x 50 t, 2x 15 t | 2x 480 t |
Drydock 3 | 1181.2 | 196.9 | 42.7 | — | 2x 50 t, 2x 15 t | 1,000 t |
Berth
Berths | Length, ft | Beam, ft | Max. draft, ft | Lifting capacity, lb | Cranes | Cranage, lb |
---|---|---|---|---|---|---|
Quay A | 2034.2 | — | 7.5 to 9 m | — | 1x 50 t, 1x 16 t | — |
Quay B | 1410.8 | — | 7.5 to 9 m | — | 1x 120 t, 1x 16 t | — |
Quay C | 1771.7 | — | 7.5 to 9 m | — | 2x 50 t | — |
Trial Quay | 426.5 | — | 7.5 to 9 m | — | — | — |
* The cranes work in tandem for dry dock no. 1 & 2
A - Materials building
B - Treatment line shop
C - Steel Stock Yard
D - Cutting & Assembly shop
E - Unit Module & Galanization shop
F - Hull offices building
G - Class & owner offices building
H - Outfitting & hull shop
J - Outfitting building
K - Hatch cover grand assembly shop
L - Pre-erection platform
M - Accommodation preoutfitting shop
N - Engine assembly shop
Q - DD2 Gate offices building
R - M/E storage shop
S - New grand assembly platform
T - New panel block shop
U - Main entrance
V - Main office
W - New blasting & painting cells
X - Painting Maintenance Shop
Y - Blasting Cells
Z - Ship Repair Office / Ship Repair Outfitting & Mechanical Shops
AA - Painting Cells
BB - Steel outfitting blasting cells
CC - Maintenance building
DD - Ship Repair Electrical Shop & Maintenance Shop
CONTACT US
By submitting 'Ask a question' form, any information you provide to Damen will be used in accordance with Damen Privacy Policy.
* Required fields